Port of Long Beach Gerald Desmond Bridge Replacement Project - HDP #04-086

10 Documents in Project

Summary

SCH Number
2002101141
Lead Agency
Port of Long Beach
Document Title
Port of Long Beach Gerald Desmond Bridge Replacement Project - HDP #04-086
Document Type
NOD - Notice of Determination
Received
Posted
11/9/2012
Present Land Use
IP-Port Industrial
Document Description
Special Note: Addendum No. 2 to the previously certified EIR was prepared, considered, and approved in connection with the Board of Harbor Commissioners' approval of the project modifications described herein. The EIR Addendum addresses revisions to the Gerald Desmond Bridge Replacement Project, which was originally approved by the Long Beach Board of Harbor Commissioners on August 9, 2010. The approved by the Long beach Board of harbor Commissioners on August 9, 2010. The approved project consists of a new bridge to be located approximately 140 feet north of the existing Gerald Desmond Bridge, related roadway connections, interchange and ramp improvements, and the demolition of the existing Bridge. The project changes that are the subject of the Addendum are as follows: (1) the addition of a Class 1 bikeway, including a pedestrian walkway, that connects SR 47 to Pico Avenue; and (2) the modification of the noise control measures to provide equivalent noise control/minimization in connection with a change in the allowable working hours during construction of the project.

Contact Information

Name
Stacey Crouch
Agency Name
Port of Long Beach
Contact Types
Lead/Public Agency

Location

Cities
Long Beach
Counties
Los Angeles
Cross Streets
Ocean Boulevard and Pico Avenue
Zip
90802
State Highways
I-710
Waterways
Los Angeles River

Notice of Determination

Approving Agency
City of Long beach
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.