Copper Hill Elementary School

4 Documents in Project

Summary

SCH Number
2002101134
Lead Agency
Saugus Union School District
Document Title
Copper Hill Elementary School
Document Type
NOD - Notice of Determination
Received
Posted
11/13/2006
Present Land Use
A 2-1 / A 2-2 Heavy Agricultural
Document Description
The Saugus Union School District ("District") previously considered and approved a MND for the construction and operation of the proposed Copper Hill Elementary School on approximately 20 acres of land already owned by the District. The Bouquet Canyon Project contemplated the grading of approximately 20 acres of undeveloped land, construction of a 70,000 square foot elementary school, as well as related appurtenant structures, facilities, and site improvement work, specifically delineated in connection with that project, to serve approximately 950 students in grades K-6. The District now seeks to amend the Bouquet Canyon Project to include, in addition to the previously considered on-site and off-site improvements, the importation and compacting of up to 260,000 cubic yards of excess soil materials from a site contiguous to the Bouquet Canyon Project site and owned by Dentec Holding, Inc., or its successors or assigns.

Contact Information

Name
Harold Pierre
Agency Name
Saugus Union School District
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Regions
Unincorporated
Cross Streets
SE of Copper Hill Drive & Haskel Canyon Road
Zip
91350
Total Acres
20
Parcel #
3244-035-003, 008, 270, 901; 3244-034-271
Schools
Saugus Union and Wm. S. Hart Union High School Districts
Waterways
Local Wash / Aqueduct
Township
4N
Range
16W
Section
1
Base
SB

Notice of Determination

Approving Agency
Board of Trustees Saugus Union School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print