Copper Hill Elementary School

4 Documents in Project

Summary

SCH Number
2002101134
Lead Agency
Saugus Union School District
Document Title
Copper Hill Elementary School
Document Type
NOD - Notice of Determination
Received
Posted
12/9/2002
Present Land Use
Agricultural
Document Description
The Saugus Union School District ("District") proposes to undertake the construction and operation of the proposed Copper Hill Elementary School on approximately 20 acres of land already owned by the District ("Project"). The Project contemplates construction of classroom facilities of approximately 70,000 square feet, organized in single-story buildings with covered walkways and fencing. Facilities to be constructed include classrooms for approximately 950 students in grades kindergarten through six (K-6); administration and library buildings; kitchen; outdoor food shelter; computer lab, day-care building, multi-purpose auditorium; parking facilities for visitors and staff with approximately 110 spaces on site; bus-loading/drop-off area; parent loading/drop-off area and athletic play courts including hardscape and turf playfields. Lighting includes low level security lighting, signage lighting, and illumination of the surface parking lot and associated pedestrian areas and the Project will be surrounded by perimeter fencing. The site improvement work would consist of grading, curb and gutter placement, installation of storm drains, sewer, water and other necessary utilities including construction of an extension of Wellston Drive as an access road.

Contact Information

Name
Harold Pierre
Agency Name
Saugus Union School District
Contact Types
Lead/Public Agency

Location

Cities
Santa Clarita
Counties
Los Angeles
Cross Streets
Wellston Drive
Total Acres
~20
Parcel #
3244-035-901

Notice of Determination

Approving Agency
Board of Trustees Saugus Union School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print