Copper Mountain College Pipeline

3 Documents in Project

Summary

SCH Number
2002101117
Lead Agency
Joshua Basin Water District
Document Title
Copper Mountain College Pipeline
Document Type
NOD - Notice of Determination
Received
Posted
3/4/2003
Present Land Use
RS 1 / RM
Document Description
The proposed pipeline project would be designed and constructed by the Joshua Basin Water District as an extension of their existing domestic water distribution system. The existing Copper Mountain College (CMC) facility is near the eastern limit of the District's service area and is not currently connected to the District's water distribution system. The CMC currently pumps water using a well with a storage tank. The Copper Mountain College is planning a substantial expansion of its facilities. The proposed expansion will require more water than the current well can produce and the Fire Department flow requirements for the CMC make connection to the Joshua Basin Water District's system neccessary. The District's current distribution system on the north side of State Highway 62 ends at Sunfair Road; approximately two miles west of Rotary Way. There are three residences along the north side of the highway which also need water and fire protection.

Contact Information

Name
Terry Lyons
Agency Name
Joshua Basin Water District
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino
Cross Streets
Sunfair/Rotary & Hwy 62
Zip
92252
State Highways
62
Schools
Copper Mtn. College
Township
1N
Range
7E
Section
26, 27
Base
S. Bdo.

Notice of Determination

Approving Agency
Joshua Basin Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print