Interstate 15 Managed Lanes

6 Documents in Project

Summary

SCH Number
2002101112
Lead Agency
California Department of Transportation, District 11
Document Title
Interstate 15 Managed Lanes
Document Type
NOD - Notice of Determination
Received
Posted
6/13/2003
Present Land Use
Transportation Corridor
Document Description
The California Department of Transportation will improve freeway capacity and transit opportunities on Interstate 15 by enhancing both freeway and high occupancy vehicles (HOV) facilities. A strategy called Managed Lanes is being pursued to provide capacity for buses and carpools. In addition, if approved by FHWA, the value-pricing program would allow single occupancy vehicles (SOV) to utilize excess capacity on the lanes. The managed lanes will be constructed within the existing freeway median, though some outside widening is required. Some new right-of-way will be required for temporary construction easements, grading and drainage easements, retaining wall footing easements, and soil-nail and tieback easements. There will be no acquisition of homes or businesses. On the four proposed managed lanes, a moveable median barrier will be utilized that will allow for additional traffic lanes in the peak direction. Traffic will flow in both directions with a minimum of one lane. Fixed concrete barriers will separate the managed lanes from the main lanes with access openings at two to three mile intervals. Four direct access ramps are also proposed.

Contact Information

Name
CA Dept. of Transportation
Agency Name
Department of Transportation, District 11
Contact Types
Lead/Public Agency

Location

Cities
Escondido, San Diego
Counties
San Diego
Cross Streets
From SR-163 to SR-78
Total Acres
400
State Highways
52, 163, 56, 78
Waterways
Green Valley, Las Penasquitos, San Clemente Creeks & LK Hodges
Base
S.B

Notice of Determination

Approving Agency
California Dept. of Transportation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.