Cantarini Ranch and Holly Springs
6 Documents in Project
Summary
SCH Number
2002101081
Lead Agency
City of Carlsbad
Document Title
Cantarini Ranch and Holly Springs
Document Type
NOD - Notice of Determination
Received
Posted
11/21/2008
Present Land Use
Vacant/agricultural
Existing Zoning : L-C and RA 10,000 Proposed Zoning: R-1-0.5 acre (1/2 acre min lot size); RD-M-Q (Residential density multiple); OS (open space)
Existing General Plan Designation: RLM (Residential Low-Medium 3.2 du/ac) and OS (Open Space) Proposed General Plan Designation: RLM, OS, and RMH (Residential Medium High - 11.5 du/ac) for the multi-family site.
Document Description
The applicant proposes to alter the streambeds of one unnamed tributary to Little Encinas Creek, two isolated drainages, and four unnamed tributaries to Agua Hedionda Creek, to accommodate the construction of the Cantarini Ranch and Holly Springs Development projects. Construction activity will impact 2.85 acres of streambed. (SAA#1600-2003-5028-R5)
Contact Information
Name
Tamara Spear
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Carlsbad
Counties
San Diego
Cross Streets
Northeast of El Camino Real / College Boulevard
Zip
92008
Total Acres
276
Parcel #
209-070-01, 02; 209-060-06; 168-050-26, 06, 07, 44, 45
State Highways
I-5
Railways
NCTD
Airports
McClellan/Palomar
Schools
Carlsbad Unified School District
Waterways
Agua Hedionda Lagoon
Notice of Determination
Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.