Storm Drain Alternative Outlet Project (25-year General Lease - Public Agency Use)

3 Documents in Project

Summary

SCH Number
2002101066
Lead Agency
City of Dana Point
Document Title
Storm Drain Alternative Outlet Project (25-year General Lease - Public Agency Use)
Document Type
NOD - Notice of Determination
Received
Posted
6/29/2011
Present Land Use
Recreational Beach
Document Description
The storm drain will be constructed under Camino Capistrano north of Palisades Drive, Coast Hwy, and terminate on the beach owned by the County of Orange. The storm drain will capture bluff top drainage and carry it to the Pacific Ocean. The project includes the construction of a diversion structure that will divert the dry season low-flows into an existing sanitary sewer system. However, flows that exceed the diversion structure capacity will by-pass the sewer system and discharge into the ocean as currently exists. The storm drain outlet will be installed west of Coast Hwy and the proposed diversion structure and Beach Road.

Contact Information

Name
J. Smith
Agency Name
CA State Lands Commission
Contact Types
Lead/Public Agency

Location

Cities
Dana Point
Counties
Orange
Cross Streets
Palisades Drive/Coast HIghway Intersection
Zip
92629
Parcel #
123-060-10, -14, -15, -17
State Highways
1
Waterways
Capistrano Beach and Pacific Ocean

Notice of Determination

Approving Agency
CA State Lands Comm.
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.