Onaga/La Contenta Pipeline

3 Documents in Project

Summary

SCH Number
2002101057
Lead Agency
Joshua Basin Water District
Document Title
Onaga/La Contenta Pipeline
Document Type
NOD - Notice of Determination
Received
Posted
3/4/2003
Present Land Use
RL-5
Document Description
The proposed pipeline project would be designed and constructed by the Joshua Basin Water District as an extension of their existing domestic water distribution system. There are currently no regular water deliveries to residences that would be served by the project. The pipeline would be 12-inch PVC and would connect to an existing 12-inch ductile iron pipeline in Troll Canyon Road at its intersection with Navajo Trail. From the existing line at the intersection of Troll Canyon Road and Navajo Trail, the alignment runs, approximately 700 feet to the west, then north on an unnamed road approximately 700 feet top Onaga Trail, then westerly for approximately 1,300 feet to La Contenta Road. The pipeline would run north and south of Onaga in La Contenta Road for a total of approximately 1,400 feet. The total length of the proposed pipeline is 4,100 linear feet. The pipe would be buried approximately three feet below the surface in existing road alignments and an existing utility corridor that crosses a natural drainage located within the pipeline alignment.

Contact Information

Name
Terry Lyons
Agency Name
Joshua Basin Water District
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino
Cross Streets
Onaga Trail, La Contenta Road
Zip
92252
Total Acres
2.75
State Highways
62
Township
1S
Range
6E
Section
4
Base
SBDO

Notice of Determination

Approving Agency
Joshua Basin Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print