Telephone Hills Loop Upgrade

5 Documents in Project

Summary

SCH Number
2002101041
Lead Agency
West Kern Water District (WKWD)
Document Title
Telephone Hills Loop Upgrade
Document Type
NOD - Notice of Determination
Received
Posted
8/17/2004
Present Land Use
Undeveloped or industrial/Zoning-Exclusive Agriculture (A)/General Plan-Mineral and Petroleum (8,4)
Document Description
The applicant proposes to exclude the installation of the 17,400-foot, Phase II portion of a pipeline, from the original project. The project will now consist of the construction of a two-million gallon water tank at an existing water storage location, and the installation of a 9,258 foot water pipeline (Phase I pipeline). The project will result in impacts to the San Joaquin kit fox, giant kangaroo rat, and San Joaquin antelope squirrel which are protected under the California Endagered Species Act, which is required issuance of a California Incidental Take Permit. At this time, the California Department of Fish and Game is making a minor amendment to that Permit to 1) exclude Phase II from the Permit; 2) reduce the amount of security, capital endowment, and Habitat Management Land required to minimize and impacts to the species listed above to reflect the removal of the Phase II pipeline from the scope of the project construction.

Contact Information

Name
Annette Tenneboe
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Kern
Cross Streets
SR 33 and Shale Road
State Highways
33
Other Location Info
near Derby Acres

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes