Energy Conservation Measures Project at the San Francisco Civic Center Complex

Summary

SCH Number
2002098341
Public Agency
Department of General Services (DGS)
Document Title
Energy Conservation Measures Project at the San Francisco Civic Center Complex
Document Type
NOE - Notice of Exemption
Received
Posted
9/20/2002
Document Description
The Department of General Services proposes to retrofit this state facility in order to conserve energy and reduce expenses. The Civic Center complex consists of two attached building, 350 McAllister Street is a 6-story granite building completely remodeled and 445 Golden Gate Avenue is a new 19-story high-rise glass and steel building. The two buildings have totally different HVAC systems linked by a common condenser water loop with open cooling towers on the roof of the 455 building and a central heating system located in the basement of the 350 building. This project will include the following: install variable speed drives on several existing motors, install variable speed drive on cooling tower, install energy management system and lighting retrofit.

Contact Information

Name
Nancy Whiteside
Agency Name
Department of General Services, Energy Management Division
Contact Types
Lead/Public Agency

Location

Cities
San Francisco
Counties
San Francisco

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
class 1; sec. 15301
Reasons for Exemption
The project consists of interior alterations to the energy system at an existing State facility involving no expansion of an existing use. The area in which the project is located is not environmentally sensitive.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print