Chamois Production Well Project
2 Documents in Project
Summary
SCH Number
2002091046
Lead Agency
Crestline Village Water District
Document Title
Chamois Production Well Project
Document Type
NOD - Notice of Determination
Received
Posted
10/22/2002
Document Description
The proposed project consists of development and production of a vertical well using the existing well casing within the community of Crestline. a submersible pump with a 10 (+/-) horsepower submersible electric motor, power cable, and discharge piping will be installed within the well casing. A small segment (approximately 50 linear feet) of pipe is needed to connect the well to the existing water main and a small protective structure will be built on top of the reinforced concrete slab surrounding the well casing in the center of the graded well pad. The new facilities will augment water supply for existing and future development consistent with the CVWD's Urban Water Management Plan and the San Bernardino County General Plan.
Contact Information
Name
Norman L. Hunt
Agency Name
Crestline Village Water District
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Bernardino
Cross Streets
Northeast corner of North Road and Chamois Drive
Zip
92325
Total Acres
25 sf
Parcel #
0340-191-11-0000
Township
2N
Range
4W
Section
25
Base
SBBM
Notice of Determination
Approving Agency
Crestline Village Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.