Maintenance Warehouse

2 Documents in Project

Summary

SCH Number
2002091019
Lead Agency
City of San Diego
Document Title
Maintenance Warehouse
Document Type
NOD - Notice of Determination
Received
Posted
12/16/2002
Present Land Use
Los Penosquitos Canyon Preserve/Open Space.
Document Description
The installation of 3,400 linear feet of two four-inch diameter PVC communication conduits within the Los Penasquitos Canyon Preserve and portion of Sabre Springs Parkway and Poway Road. The trench for the communication lines alignment would be approximately eight-inches in width and have an average depth of approximately 30-inches. The fiber-optic communication lines would allow for a connection between Maintenance Warehouse's corporate building located at the south side of Los Penasquitos Canyon Preserve and an existing Pacific Bell communications system located north of the perserve at the intersection of Sabre Springs Parkway and Poway Road. An easement would be placed over the entire linear length of the proposed fiber-optic alignment.

Contact Information

Name
E. Shearer-Nguyen
Agency Name
City of San Diego
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Downy Road and Sabre Springs Parkway
State Highways
15
Schools
Pomeraldo Meadowbrook Intermediate
Waterways
Penasquitos Creek
Other Location Info
City: Sabre Springs

Notice of Determination

Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print