Nipomo Creek Culvert Installation
2 Documents in Project
Summary
SCH Number
2002089032
Lead Agency
San Luis Obispo County
Document Title
Nipomo Creek Culvert Installation
Document Type
NOD - Notice of Determination
Received
Posted
12/27/2002
Document Description
An unnamed intermittent tributary to Nipomo Creek, south of the community of Nipomo, crosses under Wineman Road through two, 48-inch diameter corrugated metal pipe (CMP) culverts. The proposed project would remove the existing culverts and install two new CMP culverts of the same size. Approximately 125 cubic yards of imported fill would be placed on top of the culverts and compacted. Approximately 50 cubic yards of rock slope protection would be installed at the culvert inlets and outlets to reduce water velocity passing through the culverts and minimize erosion at the site. Man-made and other accumulated debris will be removed from the stream to prevent blockage of the culverts and facilitate the flow of water. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number R3-2002-0069 pursuant to section 1601 of the Fish and Game Code to the project operator, Cliff Howe, Department of Engineering.
Contact Information
Name
Scott Wilson
Agency Name
Department of Fish and Game, Region 3
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Nipomo
Counties
San Luis Obispo
Notice of Determination
Approving Agency
Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.