Sacramento River Flood Control System Evaluation, Phase II - Site 7 Extension
2 Documents in Project
Summary
SCH Number
2002082089
Lead Agency
Central Valley Flood Protection Board
Document Title
Sacramento River Flood Control System Evaluation, Phase II - Site 7 Extension
Document Type
NOD - Notice of Determination
Received
Posted
2/20/2003
Present Land Use
Agricultural
Document Description
Levee modifications on approximately 1.8 miles of existing levee consisting of a combination of seepage berm, stability berm and 20 relief wells along landside toe of levee. Relocation of pump station No. 2 of R.D. 784 approximately 100 feet landward of its current location.
Contact Information
Name
The Reclamation Board
Agency Name
Reclamation Board
Contact Types
Lead/Public Agency
Phone
Location
Counties
Yuba
Total Acres
18
State Highways
70
Waterways
Feather River, Bear River
Township
13N
Range
4E
Section
18,19
Other Location Info
Olivehurst
Notice of Determination
Approving Agency
Reclamation Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.