Transportation System Capital Improvement Project, Agreement No 1600-2013-0114-R2
33 Documents in Project
Summary
SCH Number
2002082057
Lead Agency
City of Roseville
Document Title
Transportation System Capital Improvement Project, Agreement No 1600-2013-0114-R2
Document Type
NOD - Notice of Determination
Received
Posted
5/14/2014
Present Land Use
low density residential, public (schools), open space, parks
Document Description
CDFW is executing a Lake or Streambed Atleration AGreement No. 1600-2013-0114-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, the City of Roseville Public Works Department.
The project is limited to installation of a two lane bridge over an unnamed tributary to Pleasant Grove Creek, as well as the construction of an outfall structure from the extension of Blue Oaks Blvd. and the newly constructed bridge that will empty into Pleasant Grove Creek. Approximately 140 cubic yards of rip rap will be placed below the outfall structure on the bed and bank of Pleasant Grove Creek to prevent erosion as the result of discharge from the new outfall. Two headwalls (approximately 20 cubic yards each) will be constructed out of concrete along each bank and a concrete strip (approximately 20 cubic yards) will line the channel bottom just below the outfall structure.
Contact Information
Name
Patrick Moeszinger
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Roseville
Counties
Placer
Cross Streets
Fiddyment Road & Blue Oaks, Hayden Parkway
Zip
95747
Total Acres
805
Parcel #
several
Schools
Junction ES and West Roseville HS
Waterways
Pleasant Grove Creek
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.