Lake or Streambed Alteration Agreement No. R1-09-0050 Martin Slough Interceptor Project - Phase 1
12 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2002082043
- Lead Agency
- City of Eureka
- Document Title
- Lake or Streambed Alteration Agreement No. R1-09-0050 Martin Slough Interceptor Project - Phase 1
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/6/2011
- Present Land Use
- Project elements are located in areas with a variety of planning designations in the City of Eureka and County of Humboldt planning jurisdictions. The EIR will identify the land use designations in the areas in which the project elements are located.
- Document Description
- The Project proposes the installation of sewer pipeline crossings at eight locations, the replacement of three existing culvert road/stream crossings, the installation of two instream log cover structures, and the restoration of 280 linear feet of riparian habitat on Martin Slough and unnamed tributaries to Martin Slough, Humboldt County.
- Contact Information
-
Scott Bauer
DFG - Northern Region
Lead/Public Agency
601 Locust Street
Redding, CA 96001
Phone : (707) 441-2011
Location
- Cities
- Eureka
- Counties
- Humboldt
- Cross Streets
- Numerous City and County Streets
- Zip
- 95501
- State Highways
- 101
- Railways
- North Western Pacific
- Schools
- Eureka City Schools
- Waterways
- Humboldt Bay; Martin Slough
- Township
- 4N, 5N
- Range
- 1W
- Base
- HM
- Other Information
- 3,4; 33, 34, 35
Notice of Determination
- Approving Agency
- DFG
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- DFG 619 Second Street Eureka, CA 95501
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.