Martin Slough Interceptor Project
12 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2002082043
- Lead Agency
- City of Eureka
- Document Title
- Martin Slough Interceptor Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/5/2008
- Present Land Use
- Project elements are located in areas with a variety of planning designations in the City of Eureka and County of Humboldt planning jurisdictions. The EIR will identify the land use designations in the areas in which the project elements are located.
- Document Description
- The Martin Slough component will involve re-routing and upgrading the existing collection system that will eventually connect directly to the Elk River WWTP. The Martin Slough Component will construct Phase 1 components, which will include constructing and installing ~2.1 miles of interceptor piping that will convey wastewater from the City's 'O' Street lift station to the Golf Course lift station.
- Contact Information
-
Lisa Lee
State Water Resources Control Board, Div of Financial Assistance
Lead/Public Agency
1001 I St., 16th Floor
Sacramento, CA 95814
Phone : (916) 327-9401
Location
- Cities
- Eureka
- Counties
- Humboldt
- Cross Streets
- Numerous City and County Streets
- Zip
- 95501
- State Highways
- 101
- Railways
- North Western Pacific
- Schools
- Eureka City Schools
- Waterways
- Humboldt Bay; Martin Slough
- Township
- 4N, 5N
- Range
- 1W
- Base
- HM
- Other Information
- 3,4; 33, 34, 35
Notice of Determination
- Approving Agency
- Staet Water Resources Control Board, Div of Financial Assistance
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Staet Water Resources Control Board, Div of Financial Assistance, 1001 I St., 16th Floor, Sacramento, CA 95814
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.