Martin Slough Interceptor Project

12 Documents in Project

Summary

SCH Number
2002082043
Lead Agency
City of Eureka
Document Title
Martin Slough Interceptor Project
Document Type
NOD - Notice of Determination
Received
Posted
10/7/2004
Present Land Use
Project elements are located in areas with a variety of planning designations in the City of Eureka and County of Humboldt planning jurisdictions. The EIR will identify the land use designations in the areas in which the project elements are located.
Document Description
The Martin Slough Interceptor Project is proposed in order to increase the reliability of the City's existing wastewater collection system for avoiding wastewater overflows in the project area, as well as increasing the cost-effectiveness of the system's operations. The proposed project generally includes elements in three major segments: (1) a collection system for wastewater from a new "interceptor" pipeline, all operating primarily under the influence of gravity; (2) a new pump station, located at Pine Hill Road and Myers Avenue; and (3) a new pressure sewer line (or "force main") that will connect the new pump station to the existing wastewater treatment facility. The new collection system and force main elements will essentially all be located below the ground surface. The pump station will be a relatively small structure, on a built-up site approximately 50 feet by 60 feet, which will include landscaping and parking areas for maintenance vehicles.

Contact Information

Name
Lisa D. Shikany
Agency Name
City of Eureka
Contact Types
Lead/Public Agency

Location

Cities
Eureka
Counties
Humboldt
Cross Streets
Numerous City and County Streets
Zip
95501
State Highways
101
Railways
North Western Pacific
Schools
Eureka City Schools
Waterways
Humboldt Bay; Martin Slough
Township
4N, 5N
Range
1W
Base
HM
Other Information
3,4; 33, 34, 35

Notice of Determination

Approving Agency
City Council of the City of Eureka
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes