Lake or Streambed Alteration Agreement No. 1600-2013-0099-R1 - Martin Slough Interceptor Project - Phase 2

12 Documents in Project

Summary

SCH Number
2002082043
Lead Agency
City of Eureka
Document Title
Lake or Streambed Alteration Agreement No. 1600-2013-0099-R1 - Martin Slough Interceptor Project - Phase 2
Document Type
NOD - Notice of Determination
Received
Posted
2/13/2014
Present Land Use
Project elements are located in areas with a variety of planning designations in the City of Eureka and County of Humboldt planning jurisdictions. The EIR will identify the land use designations in the areas in which the project elements are located.
Document Description
As Phase 2b of the Martin Slough Interceptor Project, the City of Eureka is proposing to construct force main piping from the new Martin Slough pump station in the Eureka Municipal Golf Course to the City of Eureka Elk River Wastewater Treatment Plant. The City is currently constructing the portion of this force main piping between the new pump station and the Carrington property (APN 302-171-035). The City is proposing to construct the remaining 4,350 LF of force main piping by open-trench and horizontal directional drilling (HDD) construction methods, portions of which are located within the NR and AC zoning districts where the pipeline is a conditionally permitted use. In addition to pipeline installation, this CUP includes pipeline laydown and staging areas, and temporary access improvements.

Contact Information

Name
Lisa D. Shikany
Agency Name
City of Eureka
Contact Types
Lead/Public Agency

Location

Cities
Eureka
Counties
Humboldt
Cross Streets
Numerous City and County Streets
Zip
95501
State Highways
101
Railways
North Western Pacific
Schools
Eureka City Schools
Waterways
Humboldt Bay; Martin Slough
Township
4N, 5N
Range
1W
Base
HM
Other Information
3,4; 33, 34, 35

Notice of Determination

Approving Agency
City of Eureka
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print