San Diego State University Student Health Services Facility Campus Master Plan 2003 MND Initial Study

6 Documents in Project

Summary

SCH Number
2002081138
Lead Agency
California State University Board of Trustees
Document Title
San Diego State University Student Health Services Facility Campus Master Plan 2003 MND Initial Study
Document Type
NOD - Notice of Determination
Received
Posted
1/14/2003
Present Land Use
Zoning: RM-4-10, R1-5000. Land Use: Multi-Family Residential, Institutional/University Campus
Document Description
The proposed SHS project will involve the construction of a new four-story building that will occupy a footprint area of 18,000 s.f. between Aztec Walk and Hardy Avenue. The proposed project footprint will occupy all of the existing 111-space parking lot J and an adjacent vacated parcel currently occupied by a fraternity house. The proposed SHS will contain approximately 75,000 gross s.f. of facility space over a single-level parking garage with capacity for 90 vehicles including visitor, emergency vehicle, delivery and handicap spaces. A new surface parking lot (Lot O) will also be constructed adjacent to Aztec Walk providing an additional 90 spaces for staff and special permit parking. Lot O will be used as the marshaling yard during construction. The majority of students are expected to access the SHS via Aztec Walk, which will be widened and enhanced with seating and landscaping to provide an outdoor plaza suitable for student events. The project related vehicle traffic, while minimal, is anticipated to be east to west, as the Hardy Avenue frontage is presently a one-way street. The site of the existing 35-year old SHS building, at the intersection of Campanile Drive and Hardy Avenue, will be incorporated into the College Community Redevelopment mixed-use project.

Contact Information

Name
Mr. W Anthony Fulton
Agency Name
California State University, San Diego
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Hardy Avenue and Campanile Drive
State Highways
I-8

Notice of Determination

Approving Agency
Board of Trustees of the California State University
Approving Agency Role
Lead Agency

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print