Lynwood Unified School District Lugo Elementary School Expansion
2 Documents in Project
Summary
SCH Number
2002081129
Lead Agency
Lynwood Unified School District
Document Title
Lynwood Unified School District Lugo Elementary School Expansion
Document Type
NOD - Notice of Determination
Received
Posted
10/10/2002
Present Land Use
Elementary school and residential units, zoned R-1, and P-1 in the eastern portion of the site.
Document Description
The Lynwood Unified School District (District) proposes to expand Lugo Elementary School by 1.19 acres while increasing its enrollment from 563 to 720 students. The expansion would provide the extra space needed to facilitate the existing elementary school's attempt to replace its current portable classrooms, which were brought in initially to accommodate the over-enrollment at the school, with new permanent school buildings and other related uses. The proposed project includes site expansion that would replace the eight existing residential properties and the eastern section of Nedra Street with new hard courts and 49 new parking spaces in a surface lot located along the western edge of the site. In addition, three portable classrooms would be relocated to the western portion of the site, situated between the new hard courts and surface parking lot. Expansion activities would also include the modification of the new terminus of Nedra Street to include a gated entrance to the expanded school site. In addition to the proposed off-site improvements described above, the District also proposes on-site improvements to the Lugo Elementary School, including the replacement of existing temporary classrooms with permanent classrooms.
Contact Information
Name
Bertha del Rivero
Agency Name
Lynwood Unified School District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Lynwood
Counties
Los Angeles
Cross Streets
Pendelton and Atlantic
Zip
3S
Total Acres
4.5
State Highways
105 and 710
Airports
Compton
Township
3S
Range
12W
Base
S.Gate
Notice of Determination
Approving Agency
Lynwood Unified School District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.