City of Dana Point's "Salt Creek Storm Drain Treatment Facility: Site C" Project (Clean Beaches Initiative Project number CBI-46)

4 Documents in Project

Summary

SCH Number
2002081074
Lead Agency
City of Dana Point
Document Title
City of Dana Point's "Salt Creek Storm Drain Treatment Facility: Site C" Project (Clean Beaches Initiative Project number CBI-46)
Document Type
NOD - Notice of Determination
Received
Posted
12/15/2003
Document Description
Proposed ozone treatment facility would be housed within a reinforced concrete building about 1700 sq. ft. and include a subsurface ozone contact basin, a wet well, and a valve vault about 16-20 feet deep. These would be located onthe northeast side of the existing concrete apron at the Salt Creek storm drain's outlet. Housed within the wet well would be two submersible pumps. The\h project would also include a 2-ft. high concrete diversion berm along the western edge of the existing concrete apron that would incorporate a small slide gate. East of the berm, 2 intake manifolds would be installed in the area where water would pond. The berm would impound the stromwater and allow it to gravity flow into the wet well where it would be pumped to the treatment facility in 2 8-inch diameter pipes.

Contact Information

Name
william E. Foster
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Dana Point
Counties
Orange
Cross Streets
Beach Club Drive/Monarch Drive
Zip
92629
Parcel #
672-461-01, 670-151-55
State Highways
1
Waterways
Salt Creek and Pacific Ocean

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print