Salt Creek Storm Drain Treatment Facility
4 Documents in Project
Summary
SCH Number
2002081074
Lead Agency
City of Dana Point
Document Title
Salt Creek Storm Drain Treatment Facility
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2003
Present Land Use
Undeveloped, Golf Course, Parking Lot/Recreation and Monarch Beach Specific Plan Overlay/Recreation and Open Space
Document Description
Alter the streambed to construct the Salt Creek Storm Drain Treatment Facility in order to reduce bacteria levels in the Salt Creek dry-weather flows just prior to discharge into the ocean within the City of Dana Point. This project will include construction of a new ozone treatment facility and improvements to the existing apron in the vicinity of the Salt Creek outlet at the Pacific Ocean. The new water treatment facility will be housed within a reinforced concrete building, built into an existing grass mound in the northern corner of the Links Golf Course. In order to divert low-flows into the treatment facility, modifications to the existing concrete apron will be made. A concrete berm (diversion weir) will be constructed along the western edge of the existing apron at the outlet of Salt Creek in order to impound the water on the apron. This berm will be up to two-feet in height and incorporate a four-foot wide by two-foot high slide gate. In addition, two intake manifolds and pipes will be installed east of the berm. Storm water impounded behind the berm will gravity flow to a wet well, where it will be pumped to the treatment facility. Treated storm water will exit the treatment facility through an outlet pipe that will terminate below the diversion berm on the north side of the concrete apron.
Contact Information
Name
Sara Pashalides
Agency Name
City of Dana Point
Contact Types
Lead/Public Agency
Phone
Location
Cities
Dana Point
Counties
Orange
Cross Streets
Beach Club Drive/Monarch Drive
Zip
92629
Parcel #
672-461-01, 670-151-55
State Highways
1
Waterways
Salt Creek and Pacific Ocean
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.