Patton State Hospital Double Perimeter Fence Project and Temporary Increase in Patients and Staff

4 Documents in Project

Summary

SCH Number
2002081046
Lead Agency
California Department of Corrections and Rehabilitation (CDCR)
Document Title
Patton State Hospital Double Perimeter Fence Project and Temporary Increase in Patients and Staff
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
State Mental Hospital/ Public Facility (PF)/ Public
Document Description
A new double perimeter fence that will replace the existing security fence and include installation of improved security lighting, closed circuit television cameras, and a strain-sensitive cable sensor system. The modernized security will include construction of 13 new ground guard posts to replace existing ground guard posts (the existing guard tower will be retained.) A temporary increase in patients and staff is being proposed by DMH for up to 250 additional patients (and approximately 250 to 300 staff over 3 shifts) that may be brought to Patton State Hospital from January 2003 until one year after a new DMH facility opens in Coalinga. The proposed patient/staff increases would include installation of up to 16 modular buildings within the two secure areas of the hospital and the conversion of some office/treatment space in existing buildings in to living space for patients. An upgrade of the hospital's high-voltage electrical system as the electrical system at Patton State Hospital is operating at capacity. The upgrade of the high voltage electrical system would consist of replacing 54 distribution transformers throughout the hospital facilities and increasing the system from 2,400 volts to 4,160 volts.

Contact Information

Name
Jane Hershberger
Agency Name
Department of Corrections
Contact Types
Lead/Public Agency

Location

Cities
Highland, San Bernardino
Counties
San Bernardino
Cross Streets
Highland Avenue and Victoria Avenue
Zip
92369
Total Acres
243 acres
Parcel #
0285-191-10
State Highways
30
Schools
Oehl Elementary School & Serrano Intermediate School

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), California State Lands Commission (SLC), Department of Fish and Wildlife, Region 6, Office of Historic Preservation, Resources Agency, California Department of Transportation, District 8 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 8 (DOT)
Development Types
Other (Security improvements at existing state mental hospital.)
Local Actions
Encroachment Permit from San Bernardino Flood Control Dist.
Project Issues
Aesthetics, Air Quality, Drainage/Absorption, Hydrology/Water Quality, Noise, Transportation, Vegetation, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print