Avenue S Widening Project

2 Documents in Project

Summary

SCH Number
2002079071
Lead Agency
City of Palmdale
Document Title
Avenue S Widening Project
Document Type
NOD - Notice of Determination
Received
Posted
7/22/2002
Document Description
The first phase will include sufficient improvements and right-of-way for a four-lane roadway (including a Class I Bikeway, curb and gutter), two 3-lane bridges to replace the existing 2-lane bridge crossing the Union Pacific railroad track west of 20th Street East, drainage improvements, revised traffic signals, and modifications to the at-grade crossing of the Metrolink railroad tracks west of Sierra Highway. As part of the first phase, Avenue S will be realigned in several locations. In additiion, the first phase will include sufficient improvements and right-of-way for improved approaches from 5th Street East, Sierra Highway, 10th Street East, and 20th Street East to Avenue S, including realignment of Sierra Highway and 20th Street East. The final phase will include sufficient improvements and right-of-way for a six-lane roadway, including additional improvements to traffic signaling, drainage, and the at-grade crossing of the Metrolink tracks.

Contact Information

Name
Scott P. Harris
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Palmdale
Counties
Los Angeles

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.