Application to Appropriate Water Number 30915

2 Documents in Project

Summary

SCH Number
2002072038
Lead Agency
State Water Resources Control Board
Document Title
Application to Appropriate Water Number 30915
Document Type
NOD - Notice of Determination
Received
Posted
1/7/2003
Present Land Use
ARR (Yuba County)
Document Description
On July 1, 1999, Mr. James Siller (Applicant) filed water right Application 30915 with the State Water Resources Control Board (SWRCB). The Applicant proposes to divert a total of 89 acre-feet annually (afa) of water to storage into two onstream reservoirs, one directly upstream from the other, on Vineyard Creek tributary to Dry Creek thence Bear River thence Feather River thence Sacramento River in Yuba County from December 1 to April 30. The project area is about 16 miles east of Yuba City, California, on the USGS 7.5' Smartville Quad Map. Both reservoirs were built in 1999 by constructing two earthen dams with fill from each reservoir across the upper reach of perennial Vineyard Creek. Reservoir 1 (Pond 1) is an onstream reservoir with a capacity of 49 acre-feet (af); the purpose of the use is aquaculture. Reservoir 2 (Pond 2) is an onstream reservoir directly upstream of Pond 1 with a capacity of 40 af; the purpose of use is fire protection and recreation. Vegetation impacted during the construction above included about 83 trees and an unknown number of shrubs.

Contact Information

Name
William E. Foster
Agency Name
State Water Resources Control Board, Division of Water Rights
Contact Types
Lead/Public Agency

Location

Counties
Yuba
Parcel #
019-030-086
State Highways
20
Waterways
Vineyard Creek
Township
15N
Range
6E
Section
5
Base
M
Other Location Info
Smartville

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print