Avenue Cabrillo Storm Drain Detention Basin, P.N. 13804

2 Documents in Project

Summary

SCH Number
2002071083
Lead Agency
City of San Clemente
Document Title
Avenue Cabrillo Storm Drain Detention Basin, P.N. 13804
Document Type
NOD - Notice of Determination
Received
Posted
10/4/2002
Present Land Use
MU3-A (CZ), RM-A (CZ), RM (CZ), MU3-CB-A (CZ), P-A (CZ)/MU3-A, RM-A, RM, P-A, MU3-P-A.
Document Description
The project consists of installing a system of large pipes beneath Avenue Cabrillo that has a detention capacity of approximately 10,000 cubic feet. The culverts installed will range in size from 18 to 96 inches in diameter. The piping will start at 240 Ave. Cabrillo and end before reaching N. Ola Vista. The projecty will also include 4 catch basins and appurtenances . Sewer laterals that conflict with the storm drain improvements will be relocated.

Contact Information

Name
Ben Parker
Agency Name
City of San Clemente
Contact Types
Lead/Public Agency

Location

Cities
San Clemente
Counties
Orange
Cross Streets
Ave. Cabrillo & N. Ola Vista
Zip
92673
Total Acres
0.7
State Highways
I-5
Railways
Southern Pacific
Schools
Las Palmas Elementary
Waterways
Pacific Ocean
Township
9S
Range
7W
Section
4
Base
SBBM

Notice of Determination

Approving Agency
City of San Clemente
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print