Wildcat Canyon Road Enhancement Project (SAA R5-2003-0189)
6 Documents in Project
Summary
SCH Number
2002071077
Lead Agency
San Diego County
Document Title
Wildcat Canyon Road Enhancement Project (SAA R5-2003-0189)
Document Type
NOD - Notice of Determination
Received
Posted
5/6/2004
Present Land Use
Mix of private residences and public properties
Louis A. Stelzer County Park, Oak Oasis Open Space Preserve
The improvements are primarily within the County Right of Way
Document Description
The applicant proposes to alter the stream to widen Wildcat Canyon Road beginning at a point 1,800 feet north of M. Valley Road and ending at a point 900 feet north of Blue Sky Ranch Road to accommodate two northbound travel lanes, creating a passing lane. At Blue Sky Ranch Road, Wildcat Canyon Road will be lowered in elevation in areas where the site distance is less than standard. Additionally, the entrance to Oak Oasis Open Space Preserve will be reconfigured to line up with Blue Sky Ranch Road. Other project components include creation of a wildlife crossing/equestrian tunnel north of Blue Sky Ranch Road/Wildcat Canyon Road, and re-pavement of Willow Road with rubberized asphalt from SR-67 to Wildcat Canyon Road.
Contact Information
Name
Kelly Fisher
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Diego
Cross Streets
Willow, Muth Valley, and Blue Sky Ranch Roads
Parcel #
Various
State Highways
67
Waterways
San Diego River
Township
14;15
Range
1E
Section
27,28.
Base
ElCajon&
Other Location Info
Community: Lakeside
Other Information
Base: El Cajon Mountain and San Vicente
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.