Chestnut Avenue Widening Focused EIR
4 Documents in Project
Summary
SCH Number
2002071074
Lead Agency
City of Fresno
Document Title
Chestnut Avenue Widening Focused EIR
Document Type
NOD - Notice of Determination
Received
Posted
11/3/2004
Present Land Use
Public Street
Document Description
The project is the widening of N. Chestnut Avenue between E. Shaw and E. Bullard Avenues in the City of Fresno. The project consists of the widening of the existing two-lane road to provide two traffic lanes and a bicycle lane in each direction of travel on N. Chestnut Avenue. The project will include a center two-way left turn lane between E. Shaw and E. Barstow Avenues. Separate left and right turn lanes would be provided at the intersections of Shaw / Chestnut, Barstow / Chestnut and Bullard / Chestnut, including southbound dual left turn lanes at Shaw / Chestnut. A traffic signal would be installed at the intersection of E. Bartstow and N. Chestnut Avenues. The proposed project would backfill the existing Fresno Irrigation District canal on the west side of N. Chestnut Avenue south of E. Bartstow Avenue and would include the under grounding of existing overhead utilities between E. Shaw and E. Bullard Avenues. Street lights, storm drains, curb and gutter and wheelchair ramps would be installed by the project. The street widening project includes the removal of 23 mature eucalyptus trees from the west side of N. Chestnut Avenue and one row (54 trees) of CSU Fresno walnut trees on the east side of N. Chestnut Avenue.
Contact Information
Name
Diane C. Eidam
Agency Name
California Transportation Commission
Contact Types
Lead/Public Agency
Location
Cities
Fresno
Counties
Fresno
Cross Streets
Chestnut/Shaw - Chestnut/Bullard
Parcel #
420-02-017, -013, -018, -019
State Highways
168
Airports
Fresno/Yosemite International
Waterways
Fresno Irrigation District
Township
12 S
Range
20 E
Section
12
Base
MDBM
Notice of Determination
Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.