Addendum No. 2 to the Final Environmental Impact Report Santa Ana River Water Right Application for Supplemental Water Supply, SCH NO. 2002071062 for the Revisi
8 Documents in Project
Summary
SCH Number
2002071062
Lead Agency
San Bernardino Valley Municipal Water District
Document Title
Addendum No. 2 to the Final Environmental Impact Report Santa Ana River Water Right Application for Supplemental Water Supply, SCH NO. 2002071062 for the Revisi
Document Type
NOD - Notice of Determination
Received
Posted
2/9/2016
Present Land Use
Multiple
Document Description
This document is prepared as Addendum No. 2 to a previously certified environmental document: the FEIR Santa Ana River Water Right Application for Supplemental Water Supply. San Bernardino Valley Municipal Water District re-designed a portion of the facilities subsequent to their approval to avoid power poles and sensitive riparian habitat of concern to CDFW, and it is these revised facilities that are the focus of the Addendum.
The District seeks to add modified facilities to an operating water diversion recharge system that are needed to capture and recharge up to 80,000 afy of local stormwater, which is a primary water management strategy of the Upper Santa Ana River Watershed Integrated Regional Water Management Plan. The specific project components include the following new facilities: 1) New Water Conservation District Channel - return flow to existing WCD channel, 2) New Access Roads; and the following revised facilities: 1) Sandbox Diversion/Inlet Structure, 2) Sedimentation Basin, 3) Plunge Pool Pipeline, 4) Outlet Structure. The specific Project components summarized above are designed to assist the District to meet the aforementioned goals based on capture and recharge of high quality stormwater runoff in the upper portion of the Watershed during wet years, with a focus on the provision of sufficient conveyance facilities to take advantage of the highly variable flows in the Santa Ana characterized by periodic large floods and longer periods of low flows. In essence, the proposed project is a conjunctive use project that will store available stormwater flows in wet years within the Bunker Hill regional aquifer for later extraction for wells in dry years.
Contact Information
Name
Mike Esquer
Agency Name
San Bernardino Valley MWD-Western Municipal WD of Riverside Cnty
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Bernardino
Total Acres
166
State Highways
multiple
Railways
multiple
Airports
multiple
Schools
multiple
Waterways
multiple
Notice of Determination
Approving Agency
San Bernardino Valley MWD and Western MWD of Riverside Co
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.