Mirant Power Generation Plant Annexation Project

3 Documents in Project

Summary

SCH Number
2002062080
Lead Agency
City of Pittsburg
Document Title
Mirant Power Generation Plant Annexation Project
Document Type
NOD - Notice of Determination
Received
Posted
7/20/2006
Document Description
This is a City-initiated proposal to amend the General Plan land use designations of and/or prezone approximately 1,091 acres comprised of 17 parcels (three partial) within the Northwest River subarea of the Pittsburg General Plan. The purpose of the project is to eventually annex the properties into the City of Pittsburg. The properties are located inside the City of Pittsburg's Sphere of Influence and Planning Area. The proposed General Plan land use designations, which include Industrial, Open Space and Utility/ROW, are consistent with the existing Contra Costa County General Plan land use designations. The proposed prezoning to IG (General Industrial), IL (Light Industrial), OS (Open Space), and GQ (Government Quasi Public) Districts would ensure that all properties are consistent with their respective General Plan land use designations. Prezoning will not be necessary for those lands already prezoned by the November 2005 Pittsburg voter approved Measure P or by the Council by Ordinance No. 05-1235. There is no physical development proposed with this project.

Contact Information

Name
Kenneth W. Strelo
Agency Name
City of Pittsburg
Contact Types
Lead/Public Agency

Location

Cities
Pittsburg
Counties
Contra Costa
Cross Streets
Willow Pass Road
Zip
94565
Total Acres
1,091
Parcel #
085-100-012, 014, 015; 096-092-006, 007, 009, 012, 013, 014; 096-100-015, 017, 018, 024, 025, 02
State Highways
4
Railways
Nor. Sacramento, BNSF, So. Pac.
Schools
Pittsburg HS, Pittsburg Continuation HS, Willow Cove ES
Waterways
San Joaquin / Sacramento River Delta
Other Information
Parcel Nos: 026, 027, 029.

Notice of Determination

Approving Agency
City of Pittsburg
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print