House Removal and Seepage Berm Construction, 2072 Garden Highway

2 Documents in Project

Summary

SCH Number
2002062013
Lead Agency
Sacramento Area Flood Control Agency
Document Title
House Removal and Seepage Berm Construction, 2072 Garden Highway
Document Type
NOD - Notice of Determination
Received
Posted
7/22/2002
Present Land Use
R-1-PUD (Open Space / Agricultural / Residential)
Document Description
The proposed project consists of the following actions at the site: 1) Demolition and removal of the existing house, including slab, barn, and other structures; 2) Removal of landscaping and 2 inches of topsoil from the project site, including approximately 20 ornamental trees, mostly English walnuts; and 3) Placement of sand to a depth of 5 feet throughout the 1.5 acres of the property and grading of the site to a level surface. Edges of the berm would be sloped to reduce erosion. The proposed actions would be limited to the area north of the concrete-lined drainage ditch along Garden Highway at the southern edge of the property. No construction would occur in the ditch itself, or in the riparian woodland and park site south of Garden Highway.

Contact Information

Name
E.I. Hodgkins
Agency Name
Sacramento Area Flood Control Agency
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Cross Streets
Garden Highway at I-80
Zip
95833
Total Acres
2
Parcel #
274-0220-017
State Highways
I-80, I-5
Schools
Bryte Elementary
Waterways
Sacramento River
Township
9N
Range
4E
Base
Sac. W
Other Location Info
South Natomas

Notice of Determination

Approving Agency
SAFCA
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.