Distributed Utility Integration Test
Summary
SCH Number
2002058441
Public Agency
California Energy Commission
Document Title
Distributed Utility Integration Test
Document Type
NOE - Notice of Exemption
Received
Posted
5/30/2002
Document Description
The purpose of this contract is to test the feasibility and value of co-location and integration of a multiple, diverse distributed energy resources (DER) into the low voltage electricity distribution system. Multiple DERs will be installed within electrical interaction proximity of each other to allow for their aggregate benefits and operational issues to be evaluated. This meets the PIER goal of Improving the Reliability/Quality of California's Electricity and Improving the Safety of California's Electricity by determining the impact of large penetrations of DER into the distribution system.
Contact Information
Name
Nancy Libonati
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Ramon
Counties
Contra Costa
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Section 15306 (6)
Reasons for Exemption
This PIER contract is for basic data collection, research, experimental management, and resource evaluation activities that do not result in major disturbances to an environmental resource.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.