Agreement No. R4-2002-0016; Priest Reservoir Bypass Project

Summary

SCH Number
2002058340
Public Agency
Fish & Game #4
Document Title
Agreement No. R4-2002-0016; Priest Reservoir Bypass Project
Document Type
NOE - Notice of Exemption
Received
Posted
5/24/2002
Document Description
Construction of a pipeline that will connect Mountain Tunnel to Moccasin Power Tunnel thereby bypassing Priest Reservoir. The pipeline will allow water to bypass Priest Reservoir during periods when the reservoir water quality is impaired by high turbidity or contamination of other pollutants. Prior to construction the reservoir will be drained. The pipeline will be constructed within the inundation zone of the reservoir and will be approximately a 1200-foot long by 9-foot diameter pipe, buried at a maximum depth of 19 feet.

Contact Information

Name
Craig Kindlin
Agency Name
Department of Fish and Game, Region 4
Contact Types
Lead/Public Agency

Location

Counties
Tuolumne

Notice of Exemption

Exempt Status
Other
Type, Section or Code
class 1; sec. 15301
Reasons for Exemption
The project involves minor alteration to an existing facility. The project site occurs within the existing footprint of Priest Reservoir. No vegetation will be disturbed and the areas will be re-contoured once the project is completed.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print