SureWest Telecommunications Tower Project at UC Davis

2 Documents in Project

Summary

SCH Number
2002052133
Lead Agency
University of California
Document Title
SureWest Telecommunications Tower Project at UC Davis
Document Type
NOD - Notice of Determination
Received
Posted
7/29/2002
Present Land Use
Academic and Administration Low Density; Academic and Administrative High Density Enterprise Reserve
Document Description
The University of California, Davis (UC Davis) proposes to partner with SureWest, a Roseville, California based telecommunications company, to exchange rights to use UC Davis property (for SureWest to construct and operate telecommunications facilities) for regional fiber optic connections. The proposed project includes the construction and operation of a 155-foot tall SureWest telecommunications tower with ancillary structures in the west campus, located northwest of Garrod Drive and adjacent and east of the existing 150-foot tall UC Davis telecommunications tower. The project also includes construcution of a single-story, 336 square-foot SureWest Controlled Environment Facility in the south campus, located west of Old Davis Road. An approximately 750-foot long telecommunications conduit would be installed to connect the proposed Controlled Environment Facility to an existing SureWest conduit located south near the intersection of Old Davis Road and the Union Pacific Railroad Tracks.

Contact Information

Name
Sid England
Agency Name
University of California
Contact Types
Lead/Public Agency

Location

Cities
Davis
Counties
Solano, Yolo
Cross Streets
Garrod Drive/SR 13; Old Davis Road/I-80
Zip
95616
Total Acres
0.36
State Highways
SR 113 and I-80
Railways
Union Pacific
Airports
University Airport
Schools
Davis Joint Unified
Waterways
Putah Creek
Township
8N
Range
2E
Section
16
Base
Mtdiablo

Notice of Determination

Approving Agency
Board of Regents of the University of California, Davis
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print