Mitigated Negative Declaration for the Proposed Westgate Elementary School, Santa Maria, CA

2 Documents in Project

Summary

SCH Number
2002051122
Lead Agency
Santa Maria-Bonita School District
Document Title
Mitigated Negative Declaration for the Proposed Westgate Elementary School, Santa Maria, CA
Document Type
NOD - Notice of Determination
Received
Posted
7/9/2002
Present Land Use
ROS/OS (PD) (General Plan/Zoning Designation)
Document Description
The proposed project consists of constructing an elementary school on a 12-acre parcel, including three 7,200-square-foot, 6-classroom pods; two 4,200-square-foot 3-classroom pods; an office/library of approximately 4,500 square feet; an adminstrative and multipurpose building of approximately 7,500 square feet; a multi-use trail; three apparatus playgrounds; four paved basketball courts; two soccer fields; two parking lots; and a driveway connecting the north side of the campus with the south side of the campus. The proposed school would serve approximately 800 students in kindergarten through sixth grade and would employ 40 to 50 teachers and adminstration staff. Nighttime lighting would be required for buildings and parking lots. Construction would take place from September 8, 2003 through July 9, 2004.

Contact Information

Name
Ms. Cynthia L. Clark
Agency Name
Santa Maria-Bonita School District
Contact Types
Lead/Public Agency

Location

Cities
Santa Maria
Counties
Santa Barbara
Cross Streets
Bethel Lane and Westgate Road
Parcel #
117-770-06 and 117-770-37
State Highways
U.S. 101
Airports
Santa Maria Public Airport

Notice of Determination

Approving Agency
Santa Maria-Bonita School District
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print