Liberty II Elementary School

2 Documents in Project

Summary

SCH Number
2002051003
Lead Agency
Santa Maria-Bonita School District
Document Title
Liberty II Elementary School
Document Type
NOD - Notice of Determination
Received
Posted
6/24/2002
Present Land Use
LDR, LMDR, CF/R-1, PD-RSL-1 (General Plan/Zoning Designation)
Document Description
The proposed project consists of constructing an elementary school on a 9.6-acre parcel, including three 7,200-square-foot, permanent, 6-classroom pods; two 7,200-square-foot, permanent, 3-classroom pods; a temporary administration building and cafeteria (both in one structure); two paved playgrounds; two turf playgrounds, and two parking lots. Sixteen Monterey pine trees and three avocado trees located on the property would be removed. The proposed school would serve approximately 800 students in kindergarten through sixth grade and would employ 40 to 50 teachers and administrative staff. Nighttime lighting would be required for buildings and parking lots (Fassiotto 2002).

Contact Information

Name
Cynthia L. Clark
Agency Name
Santa Maria-Bonita School District
Contact Types
Lead/Public Agency

Location

Cities
Santa Maria
Counties
Santa Barbara
Cross Streets
Stowell Road and Depot Street
Zip
93454
Total Acres
9.6
Parcel #
123-210-04
State Highways
U.S. 101
Railways
SMVRR

Notice of Determination

Approving Agency
Santa Maria-Bonita School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print