Paramount Homes, Van Eeghen Property

Summary

SCH Number
2002049030
Lead Agency
Alameda County
Document Title
Paramount Homes, Van Eeghen Property
Document Type
NOD - Notice of Determination
Received
Posted
4/17/2002
Document Description
The operator proposes to install a 15 inch storm drain outfall, in conjunction with the development of 3.44 acres for 12 single family homes, into an unnamed tributary to the north fork of Ward Creek, Hayward, Alameda County. The 15 inch outfall will be placed on the top of the gound and will elbow down to match the existing grade of the creek bank. The pipe will terminate with a "T" energy dissipater and loose rock rip rap. The loose rock rip rap will be keyed in at the toe. The sewer system will incorporate a Stormcepter basin to remove oil, sediment, and other pollutants from entering the creek. Twenty native trees will be planted along the western property boundary, will serve as a visual screen, and will augment the existing riparian canopy. The project is located at 25329 Second Street, Hayward, Alameda County. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number R3-2001-1026 pursuant to Section 1603 of the Fish and Game Code to the project operator, Peter Hellman/ Paramount Homes.

Contact Information

Name
Greg Martinelli
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Hayward
Counties
Alameda

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.