Stone Point
5 Documents in Project
Summary
SCH Number
2002042115
Lead Agency
City of Roseville
Document Title
Stone Point
Document Type
NOD - Notice of Determination
Received
Posted
5/24/2002
Present Land Use
Vacant/ Planned Development for R & D/ Business Professional, Light Industrial
Document Description
Zoning Interpretation (ZI 02-01) for the site which establishes a list of permitted use types; Major Project Permit, Stage 1, (MPP 01-05) to construct a 1.65 million square foot research and development and professional office campus consisting of 21 building pads on 17 parcels and including site grading, parking, landscaping, a 2.0 acre public park, a public collector street from Rocky Ridge Road to N. Sunrise Avenue and a public trail connection to the Miner's Ravine bike trail; Major Project Permit, Stage 2 (MPP 02-01) to construct two three-story office buildings, 90,000 square feet each; Tree Permit (TP 01-54) to remove 215 native oak trees totaling 4,006 inches Diameter at Breast Height (DBH), and encroach within the protected zone radius (PZR) of 93 native oak trees. (DBH); and Tentative Subdivision Map (SUBD 00-07) to divide the 130 acre property into nineteen lots varying in size from 1.15 to 25.9 acres, including a 2 acre public park site, a 25.9 acre open space parcel and seventeen developable parcels.
Contact Information
Name
Michael Dour
Agency Name
City of Roseville
Contact Types
Lead/Public Agency
Phone
Location
Cities
Roseville
Counties
Placer
Cross Streets
N. Sunrise, Rocky Ridge
Zip
95661
Total Acres
130
Parcel #
048-460-007
State Highways
80, 65
Railways
UPRR
Schools
Roseville HS, Sargeant Elem, Olympus Jr. High
Waterways
Dry Creek, Antelope Creek, Miner's Ravine, False Ravine, Lirby Creek
Township
11N
Range
7E
Section
31,36
Base
MDBM
Notice of Determination
Approving Agency
City of Roseville
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.