Rocking "H" Ranch Precise Development Plan Draft
3 Documents in Project
Summary
SCH Number
2002042110
Lead Agency
Marin County
Document Title
Rocking "H" Ranch Precise Development Plan Draft
Document Type
NOD - Notice of Determination
Received
Posted
6/3/2002
Present Land Use
Vacant Land; Zoning: RMP-0-1 (Residential Multiple Family one unit per 10 acres); GP Use: PR (Planned Residential, 1 unit per 1-10 acres) Planned District, with a ridge & upland greenbelt area overlay.
Document Description
Construction of a 14,400 square foot single-family residence and accessory improvements: a 640 s.f. garden pavilion, a 6,300 s.f. car barn/private music studio/caretaker's unit, a 1,300 s.f. gate house, a 3,300 foot long access driveway over existing road, a swimming pool, 4 water storage tanks, 2 septic systems for on-site sewage disposal, and on-site water well for domestic acre property located south of lucas Valley Road and all development will be contained within a 60-acre development envelope, with the remaining 441 acres of conservation easement, which is, in part, to reduce the density potential of the property from 50 units to a total of 4 units.
Contact Information
Name
Christine Gimmler
Agency Name
Marin County Community Development Agency
Contact Types
Lead/Public Agency
Phone
Location
Counties
Marin
Cross Streets
3001 Lucas Valley Road
Zip
94946
Total Acres
501 acres
Parcel #
164-320-07
Waterways
Miller Creek
Other Location Info
City: Nicasio
Notice of Determination
Approving Agency
Marin County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.