Southwest Dixon – Harvest Property Operable Unit 3-East Removal Action Work Plan

8 Documents in Project

Summary

SCH Number
2002042037
Lead Agency
City of Dixon
Document Title
Southwest Dixon – Harvest Property Operable Unit 3-East Removal Action Work Plan
Document Type
NOD - Notice of Determination
Received
Posted
2/27/2024
Document Description
The Department of Toxic Substances Control (DTSC) approved the Removal Action Workplan (RAW) for the Southwest (SW) Dixon – Harvest Property Operable Unit 3-East (Project Site). The RAW addressed the impacts of elevated toxaphene levels in soils at the Project Site. The cleanup decision document, referred to as a RAW, specified the removal action objectives, identified the contaminants of concerns (COCs), and identified the remedy protective of human health and the environment. The approved remedy consists of the following elements: • Excavation of an estimated 56,000 cubic yards of the top 12 inches of toxaphene-impacted soil; • Stockpiling of the excavated soil on site for off haul; • Transport of the soil to an appropriate permitted disposal facility; and • Collection of confirmation soil samples across the excavation area and excavation sidewalls to verify the removal of toxaphene-impacted soil to levels below those acceptable for residential development.

Contact Information

Name
Karri Peters
Agency Name
Department of Toxic Substances Control
Job Title
Project Manager
Contact Types
Responsible Agency

Location

Cities
Dixon
Counties
Solano
Regions
Northern California
Zip
95620
Other Location Info
South of West A Street and west of Pitt School Road, Dixon

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Solano
Final Environmental Document Available at
https://www.envirostor.dtsc.ca.gov/public/profile_report.asp?global_id=60002862&mytab=activities

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Environmental Impact Report Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print