Rancho Del Rey Library

2 Documents in Project

Summary

SCH Number
2002041173
Lead Agency
City of Chula Vista
Document Title
Rancho Del Rey Library
Document Type
NOD - Notice of Determination
Received
Posted
6/17/2002
Present Land Use
Previously graded, vacant pad Open Space-2 District Parks and Recreation
Document Description
The proposed project consists of the submittal of a grant application to the State of California for the partial funding of the design and construction of a planned two-story, approximately 36,000 square foot City of Chula Vista public library branch, as well as the construction and operation of this facility. Vehicular access to the project site would be via driveways on Paseo Ranchero and East "H" Street. Approximately 190 on-site surface parking spaces are proposed. Two entrances into the library building are proposed, one on the north side of the building with a vehicular drop-off area and the other at the southeast corner of the building adjacent to the northwest corner of East "H" Street and Paseo Ranchero, in close proximity to an existing Chula Vista Transit bus stop.

Contact Information

Name
Paul Hellman
Agency Name
City of Chula Vista
Contact Types
Lead/Public Agency

Location

Cities
Chula Vista
Counties
San Diego
Cross Streets
East "H" Street, Paseo Ranchero
Zip
91910
Total Acres
4
Parcel #
642-391-06-00
State Highways
17
Schools
Southwestern Community College
Waterways
Sweetwater River

Notice of Determination

Approving Agency
City of Chula Vista City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print