V & J Sand Mining Operation

5 Documents in Project

Summary

SCH Number
2002041066
Lead Agency
Lompoc, City of (City of Lompoc)
Document Title
V & J Sand Mining Operation
Document Type
NOD - Notice of Determination
Received

Document Description
The Permittee intends to alter the river to extract an average of 60,000 cubic yards of sand per year using a bar skimming method. The san removed will be the excess material that has accumulated by deposition from previous high flows. The skimming will remove the center of the bar, from downstream to upstream, leaving the two edges along the flow lines, making a horse show shaped bar, that will continue to deflect flows away from the bank and prevent the river from becoming wider and eroding the banks. This will also ensure that the low flow channel remains deep, resulting in a suitable passage corridor for migrating steelhead. Extraction will be conducted with bulldozers, loaders, dump trucks and a water truck. Mining will occur in the bed of the river from a 15.57 acre area, depending on the amount of available sand and demand. No impacts to the bank or to riparian vegetation. If the water table is contacted, the Permittee shall reestablished a cap of 5 feet above the water table and shall stay a minimum of 5 feet above the water tables at all times.

Contact Information
Natasha Lohmus
California Department of Fish and Game
4949 Viewridge Avenue
San Diego, CA 92123

858-684-6281
858-467-4299

Location

Cities
Lompoc
Counties
Santa Barbara
Cross Streets
"V" Street and Central Avenue
Zip
93436
Total Acres
16
Parcel #
93-040-20, 93-450-12
State Highways
1, 246
Airports
Lompoc Municipal
Waterways
Santa Ynez River

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Regional Water Quality Control Board 895 Aerovista Place San Luis Obispo, CA 93401

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes