Repair Camp Wilson Wastewater Treatment Plant

Summary

SCH Number
2002038343
Public Agency
Regional Water Quality Control Board, Region 7 (Colorado River Basin), Palm Desert
Document Title
Repair Camp Wilson Wastewater Treatment Plant
Document Type
NOE - Notice of Exemption
Received
Posted
3/15/2002
Document Description
The discharger proposes to construct a new secondary treatment package plant (package plant) to replace the existing oxidation pond system. The package plant will provide the needed treatment capacity for the existing service area. The package plant contains three treatment modules; each module has a primary clarifier, anaerobic reactor cell, aerobic reactor cell, and a final clarifier. The effluent from the secondary clarifier gravity flows through a partial flume and then to new infiltration/evaporative ponds for final disposal.

Contact Information

Name
John Carmona
Agency Name
Regional Water Quality Control Board, Region 7 (Colorado River B
Contact Types
Lead/Public Agency

Location

Cities
Twentynine Palms
Counties
San Bernardino

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 2, Section 15302(c)
Reasons for Exemption
Replacement or reconstruction of existing structures or facilities on the same site having substantially the same purpose and capacity.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print