Shutdown and De-Watering of the Joseph P. Jensen Filtration Plant

Summary

SCH Number
2002038218
Public Agency
Metropolitan Water District of Southern California
Document Title
Shutdown and De-Watering of the Joseph P. Jensen Filtration Plant
Document Type
NOE - Notice of Exemption
Received
Posted
3/7/2002
Document Description
Metropolitan proposes to shutdown and de-water the plant's pump-back line and perform various installation, replacement and inspection activities. These activities will include the installation of a staff gauge in the effluent channel, new 4160V Switchgear, a bulkhead and ferric diffuser, the repair of the ultrasonic plant influent meters and leaks in the inlet conduits of Module 1, the replacement of the chlorine gas valves in the evaporator room, the inspection of the PCCP washwater return line, all valves in Module 1 Filters, and influent sample piping at LA-35, and the relocation of the flashmixer in the influent conduit. Upon completion of the proposed project, the plant will be put back in service.

Contact Information

Name
William Fong
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15301
Reasons for Exemption
The proposed consists of the maintenance and repair of existing public facilities involving no expansion of use beyond that existing at the time of the lead agency's determination.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print