Magpie Creek Flood Control Project

2 Documents in Project

Summary

SCH Number
2002032105
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Magpie Creek Flood Control Project
Document Type
NOD - Notice of Determination
Received
Posted
4/23/2002
Present Land Use
Open Space/Industrial
Document Description
The Magpie Creek Diversion Channel (MCDC) was constructed in the 1950s by the U.S. Army Corps of Engineers (USACE). Hydrologic evaluation by USACE and SAFCA have determined that homes and businesses in the vicinity of Magpie Creek have less than 100-year flood protection. During a 14-year of greater flood event, MCDC levees is overtopped and levees are outflanked during a 2-year or greater event. When more severe events occur, USACE is projecting extensive flooding along historic Magpie Creek, affecting residential, commercial, industrial, and public structures. USACE, SAFCA and The Reclamation Board are proposing to construct a project to protect existing structures from flooding up to the 170-year event. The proposed project includes: 1) construction of a floodwall (2,100 feet) along the top of the existing left bank levee of the MCDC; 2) construction of a levee (1,000 feet) along the west side of Raley Boulevard south from the Magpie Creek bridge; 3) Acquisition and protection of a 72-acre flood plain on the east and west sides of Raley Boulevard; 4) Construction of a culvert under the Sacramento Northern Railway embankment.

Contact Information

Name
F. I. Hodgkins
Agency Name
Sacramento Area Flood Control Agency
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Cross Streets
Raley Boulevard and Main Avenue
Total Acres
80
State Highways
I-80
Airports
McClellan Business Park
Schools
Robla Elementary, Main Avenue Elementary
Waterways
Magpie, Robla and Dry Creek, MCDC
Township
9N
Range
5E
Section
19
Other Location Info
Rio Linda

Notice of Determination

Approving Agency
Sacramento Area Flood Control Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print