San Francisco Bay Area Rapid Transit (BART) District System Extension Between Fremont and Warms Springs in Alameda County
8 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2002032041
- Lead Agency
- Bay Area Rapid Transit District
- Document Title
- San Francisco Bay Area Rapid Transit (BART) District System Extension Between Fremont and Warms Springs in Alameda County
- Document Type
- EIR - Draft EIR
- Received
- Present Land Use
- Public Facility and as "BART Station" Industrial, Public Facility, and historic district overlay
- Document Description
- BART is proposing to construct an extension of the Fremont BART line. The proposed project is the BART extension from the existing Fremont BART station 5.4 miles south to a proposed Warm Springs Station, with an optional station at Irvington. The proposed project alignment would generally parallel portions of the UP railroad corridor (which contains the former Western Pacific (WP) and Southern Pacific (SP) railroad tracks) and Interstates 680 and 880 in southern Alameda County. The initial segment would begin on an embankment at the southern end of the existing elevated Fremont BART Station. The alignment would pass over Walnut Avenue on an aerial structure and descend into a cut-and-cover subway north of Stevenson Boulevard. The alignment would continue southward in the subway structure under Fremont Central Park and the eastern arm of Lake Elizabeth, and surface to grade between the former WP and SP alignments north of Paseo Padre Parkway. The alignment would pass over Paseo Padre Parkway on a bridge structure, and then continue southward at grade, passing under a grade-separated Washington Boulevard. From Washington Boulevard, the proposed project alignment would continue at grade along the former WP alignment south to a terminus at Warm Springs and South Grimmer Boulevards in the Warm Springs district.
- Contact Information
-
Richard C. Wenzel
San Francisco Bay Area Rapid Transit District
800 Madison Street P.O. Box 12688
Oakland, CA 94604-2688
Phone : (510) 287-4950
Location
- Cities
- Fremont
- Counties
- Alameda
- Cross Streets
- Paseo Padre Parkway/Walnut Avenue to Grimmer Boulevard/Warm Springs Road
- Total Acres
- 5.4 miles
- Parcel #
- Multiple
- State Highways
- I-880;I-680;SR-92
- Railways
- Union Pacific
- Schools
- Grimmer Elementary
- Waterways
- Laguna Creek;Mission Creek
Notice of Completion
- Review Period Start
- Review Period End
- Development Type
- Transportation:Rail (BART Extension)
- Project Issues
- Aesthetic/Visual Air Quality Archaeologic-Historic Drainage/Absorption Economics/Jobs Flood Plain/Flooding Noise Population/Housing Balance Recreation/Parks Schools/Universities Soil Erosion/Compaction/Grading Toxic/Hazardous Traffic/Circulation Vegetation Water Quality Wetland/Riparian Wildlife Growth Inducing Land Use Cumulative Effects
- Reviewing Agencies
- Air Resources Board, Transportation Projects California Department of Conservation California Department of Fish and Wildlife, Bay Delta Region 3 California Department of Parks and Recreation California Department of Transportation, Division of Transportation Planning California Energy Commission California Highway Patrol California Native American Heritage Commission California Public Utilities Commission California State Lands Commission Department of Water Resources Office of Historic Preservation Resources Agency California Department of Transportation, District 4 California Regional Water Quality Control Board, San Francisco Bay Region 2
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.