San Francisco Bay Area Rapid Transit (BART) District System Extension Between Fremont and Warms Springs in Alameda County

8 Documents in Project

Summary

SCH Number
2002032041
Lead Agency
Bay Area Rapid Transit District (BART)
Document Title
San Francisco Bay Area Rapid Transit (BART) District System Extension Between Fremont and Warms Springs in Alameda County
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
The entire corridor has a General Plan Designation of "BART"
Document Description
On September 15, 1992, the BART Board of Directors certified a Final Environmental Impact Report (FEIR), adopted a Mitigation Monitoring Plan (MMP) and adopted a project for the BART Warm Springs Extension (WSX) consisting of a 5.4-mile, two-station extension of the existing BART system, with stations at Irvington and Warm Springs. The purpose of the adopted project was to extend BART service south of the Fremont BART Station to southern Alameda County. The adopted project has not been built. In conjunction with the recently passed ballot measure for the reauthorization of the Alameda County Transportation Sales Tax, a revised project consisting of a 5.4-mile, one-station extension is now being proposed. The certified FEIR must be reviewed, updated and supplemented as necessary, based on changes to the adopted project, changes to the study area, and changes to the State CEQA Guidelines since the original document was published and the project was adopted. An optional station at Washington Boulevard and Osgood Road in the Irvington District will also be evaluated. (The FEIR and MMP are available for review through Richard Wenzel, Project Director.)

Contact Information

Name
Richard Wenzel
Agency Name
San Francisco Bay Area Rapid Transit District
Contact Types
Lead/Public Agency

Location

Cities
Fremont
Counties
Alameda
Cross Streets
Fremont Blvd., Mission Blvd., Washington Blvd., Warm Springs Rd., Grimmer Blvd., and others
Total Acres
5.4 miles
State Highways
680 and 880

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Transportation Projects, California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Department of Transportation, Division of Transportation Planning (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, Resources Agency, San Francisco Bay Conservation and Development Commission (BCDC), California Department of Transportation, District 4 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 4 (DOT)
Development Types
Transportation:Rail (BART Extension)
Project Issues
Aesthetics, Air Quality, Biological Resources, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Transportation, Cultural Resources

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print