Palm and Carnation Avenue Street Ends Improvements Project

10 Documents in Project

Summary

SCH Number
2002031106
Lead Agency
San Diego, Port of
Document Title
Palm and Carnation Avenue Street Ends Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
6/12/2007
Present Land Use
Port Master Plan: Public Access
Document Description
The City of Imperial Beach was approved to receive a grant to construct a dry weather diversion system, which will be installed in the new Palm Avenue storm water pump station. The pump station serves a drainage area of ~83.2 acres of residential development, and discharges storm water into the ocean. The reconstructed pump station will include a submersible pump and two storm water pumps. The submersible pump will pump urban runoff (non-stormwater) and the first flush of storm water from the pump station's wet well to the sanitary sewer system.

Contact Information

Name
Michelle Jones
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Imperial Beach
Counties
San Diego
Cross Streets
Palm Avenue and Carnation Avenue/Ocean Lane
Zip
91932
Total Acres
0.5
Parcel #
560-001, 560-002
State Highways
I-5
Schools
Westview Elementary
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print