Heritage Valley Parks Specific Plan Draft Program EIR

10 Documents in Project

Summary

SCH Number
2002031079
Lead Agency
City of Fillmore
Document Title
Heritage Valley Parks Specific Plan Draft Program EIR
Document Type
NOD - Notice of Determination
Received
Posted
10/6/2004
Present Land Use
Agricultural and open space. Zoning for the project site is Residential Low 7 du/1ac for the 66.5 acres within the City and Agriculture (40 acre minimum) for the remaining 234.7 within the County of Ventura.
Document Description
Phase 1A is part of the Heritage Valley Parks Specific Plan, which includes the development of 750 residential units, 33 acres of parks, a 52 acre nature preserve, a 10 acre elementary school, a 1 acre fire station site, 8 acres of levee protection from the Santa Clara River and 27 acres of flood control facilities. The specific plan also includes two new connections to SR 126 and trails, including a multipurpose trail that will cross under SR 126. An addendum to the certified final program EIR including comments and responses was prepared and approved for Phase 1A is available at the City of Fillmore.

Contact Information

Name
Kevin McSweeney
Agency Name
City of Fillmore
Contact Types
Lead/Public Agency

Location

Cities
Fillmore
Counties
Ventura
Cross Streets
Central Street and State Highway 126
Total Acres
301.2
State Highways
SR 126, SR 23
Railways
Fillmore Western Railway
Waterways
Pole Creek, Santa Clara River
Township
4N
Range
19W
Section
31, 32

Notice of Determination

Approving Agency
City of Fillmore
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print